complete guide for construction of a house

The Complete Guide of House Construction: From Beginning to End

Home Construction or designing is a thrilling experience, but the task is overwhelming from the beginning to the end. This will be undertaken systematically so that you acquire the knowledge and the stages to follow while constructing a house.

With the help of this blog, we will tell you about the various stages of house construction, along with the best home construction company, etc.

Stage 1: Setting the Stage – Budget, Land, and Vision

Budgeting: 

Once a leap has been made about Home Construction, always ensure that a rational budget has been determined based on an array of factors varying from construction cost, cost of materials, permission fees, and other circumstances that may arise. Consider the price of the land when deciding to finance the building. If you want to proceed with low-budget house construction, then you only have to proceed that way.

Land Acquisition: 

Ensure you camp on a plot of your choice, depending on what you intend to use the land for and the price that you are willing to part with. Consider issues like the size of the site, location, close proximity to utilities, and current and future zoning laws.

Vision and Design: 

Make a list of features, elements, styles, and possible system functions. Consult with your local government for information on acceptable designs, search for some types of floor plans on the internet, or perhaps seek the services of an architect to develop a customized house plan that suits you best.

Stage 2: Planning and Pre-Construction

Architect Engineer Discussion Brainstorming Construction Concept

The steps of the house construction plan are given below:-

Assemble Your Team: 

Sometimes in life, it seems as though it takes a team to build a house. If one was not selected earlier, this may involve an architect, a licensed contractor, several structural engineers, and an interior designer, if necessary. Contact several interior design specialists, and choose those who have experience and knowledge in the style and cost range you want.

Permits and Approvals: 

Ensure all legal formalities are considered, and permits and licenses from the authorities are sought as required. This may include a permit for building construction, permission for zoning, and permission for plumbing, electrical, and mechanical systems. One should ask the contractor whether a license is required for the job, as they will guide one through the process.

Financing: 

Assure the basis of your project funding. Consider construction financing and other loan solutions, such as permanent mortgages. Explain your financial capacity regarding the costs and select the most suitable financing.

Stage 3: Breaking Ground – Site Preparation and Foundation

Proper Site preparation and foundation are required for excellent residential home construction:

Site Preparation: 

The contractor will eliminate the current vegetation and any other features on the property. The land may also be graded, and the contractor may set property boundaries.

Foundation Construction: 

The type of foundation shall be determined by the soil condition and house design in this particular case. A home builder can use three primary forms of foundation: slab, basement, concrete, and crawl space foundations.

Stage 4: Taking Shape – Framing, Roofing, and Exterior

Framing: 

Your house has a beam frame constructed with lumber that you should take time to understand. This means putting up walls, floors, and roof truss systems. Correct cabling and installation methodology means there will be no structural issues, creating a foundation for future fixtures.

Roofing: 

A roof deck is placed on the roof, and then a material of the owner’s preference is put onto it. Shingles, metal, or tiles can be used as some of the materials used in construction. Pay special attention to proper definition joints, especially when providing ventilation and controlling water leakages.

Exterior Finishes: 

The structural or architectural design of your house’s outside begins forming. This may mean putting on outer-facing walls, brick, stucco, or other exterior elements known as sidings. Windows and doors are also usually installed at this time.

Stage 5: Journey to the Core Making it Home – Interior Systems and Finishes

Plumbing and Electrical: 

A licensed plumber is the best choice when deciding who will install pipes, fixtures, and drains. Likewise, the electrician will have to install electrical wiring, outlets, and light fittings after acquiring a license.

HVAC Installation: 

A central heating and ventilation system regulates climatic conditions throughout the house as required. Select the energy-efficient system that will meet your requirements.

Interior Finishes: 

The framing stage also encapsulates work involving putting up the drywall, painting, floor laying, and trim. Cabinets and countertops, as well as electrical and lighting, may also be added at this stage.

Stage 6: Final Touches and Handover

Inspections: 

The project will also be inspected by local jurists to ascertain the degree of compliance with the code of construction and safety levels.

Punch List Completion: 

A punch list should be prepared that contains minor adjustment items or incomplete items that seemed not crucial initially but were left unmarked during inspection. The contractor should solve these items before the finished handover to the occupants.

Final Walk-Through: 

Schedule a final inspection/physical assessment of the areas remodeled with your contractor to review the quality of work done and completion status. This is an opportunity to perform an initial evaluation and determine whether any more issues must be resolved before closing the project.

Conclusion

Constructing your home is not only a wise investment in cash, but it is also your or your dear one’s emotional investment. More so, following the aid provided in this guide, assembling a good crew, and proper coordination will make your dream home possible. To reiterate, building a home involves much more than mortar and stone; Matic Group, one of the best home construction company, encompasses teamwork, research, and the delightful process of designing a habitat that exemplifies your distinctive personality and daily routine.

FAQs

Q. What is the first step in the construction of a house? 

The first step in constructing a house is defining your budget and the project’s scope. 

Q. Is a building permit required in house construction? 

Yes, one needs a permit and approval to construct a house. 

Q. What should be included in a construction contract? 

Your construction contract should clearly outline the project’s scope, timeline, budget, payment schedule, and all the parties’ responsibilities. 

Q. How can you stay informed about the progress of the construction? 

To stay informed about construction progress, you must maintain irregular communication with the builder, schedule site visits, and request progress reports. 

Q. What are the 6 stages of home construction?

The 6 stages of home construction are planning, design, preconstruction, procurement, construction, and closeout.